How many construction specification divisions are there




















Up until , there were only 16 Divisions more about the divisions below. Every area of construction and manufacturing for the construction industry is covered under the CSI MasterFormat. This is true for commercial, industrial, and residential buildings. MasterFormat is not to be confused with localized building codes. Building codes can change from town to town, state to state, country to country. They are what has been agreed upon within a community, rather than a far-reaching standard.

Building codes do not conflict with the MasterFormat because they have little to do with the relationship between the construction company and its vendors. However, they can and do play off of each other depending on the situation. Unlike localized building codes, MasterFormat is recognized and used throughout the United States and Canada as one set of standards that manufacturers build by and construction companies prepare for.

In the mid th century, sometime after World War II, different material types and new products began hitting markets. Division 23 — Heating Ventilating and Air Conditioning. Division 25 — Integrated Automation. Division 26 — Electrical.

Division 27 — Communications. Seila Orrios Pundit. What is specification writing in architecture? Ercilia Irabien Teacher. What is Uniformat II? Urtza Schmedes Teacher. What CSI division is security? Hafsa Ribau Teacher. What is SpecsIntact? Helvia Thoman Teacher. How does the MasterFormat help all participants in the industry to communicate? It is the most common standard for organizing specifications for commercial and institutional buildings in the United States and Canada, because it helps improve communication between members of the design and construction team by providing a master list of numbers and titles to organize project manuals and detailed.

Sarah Oria Reviewer. How many levels can each division in the MasterFormat break down into? Armandina Zheltyannikov Reviewer.

How do you create a specification section? Navigate to the project's Specifications tool. In the right pane, click Manually Create Spec Sections. Choose a division into which the new spec section will be added. Provide a number for the new spec section. Provide a descriptive title for the spec section. Luftolde Aido Reviewer. How do you write a material specification? Specifications for raw materials and ingredients should contain the following information:.

Name of the material. A description of the material, including biological, chemical and physical characteristics. Composition of the material, including additives and processing aids. Country of origin. Special items that pertain to a particular job are included in the Supplemental General Conditions that are written by the architect or engineer. Special laws or building code requirements are listed in the Supplemental General Conditions.

All of these tests must be conducted, and the requirements are expressed in this division. The capping and removal of existing services is usually mentioned in this division even if the work is also included under the trade division.

In addition, the site work division describes the various steps in the clearing of the site. Also described are grading and earthwork, grading and drainage, paving and surfacing, and landscaping. Site improvements such as fences, gates, guardrails, lighting, and irrigation systems site watering systems are also included in this division.

The major subdivisions included under Division 3 are: o concrete form work, o expansion and contraction joints, o cast-in-place concrete, o specially placed concrete, o and recast concrete.

Related topics such as joint reinforcement, mortar, anchors and tie systems, masonry joints, control joints, and masonry accessories are also included. If the building has a steel structure, the steel members are specified in this section.